Identify rental repairs before refurbishment

Start with a condition list rather than assuming every wall needs a new skim. Surface marks, missing plaster and recurring cracks may need different work. Where there has been a leak or moisture problem, establish what has been resolved before specifying the final appearance.

Local repairs or full-room plastering

Local repairs can suit limited damage on sound backgrounds. Wider skimming may make sense when a whole surface needs a new finish. Include the reason for each item so a cosmetic refresh is not confused with remedial work to loose or deteriorated material.

Plan access around tenants and occupancy

Say whether the property is vacant or occupied and who will arrange access. Furniture, stored belongings and shared spaces may affect the work area. Agree the communication and protection arrangements with the relevant parties; the plastering scope should not rely on unconfirmed access assumptions.

Record condition and completion requirements

Photographs and room labels help an owner, agent and contractor discuss the same areas. Record repairs around services, retained features and surfaces excluded from the job. After a leak, include source-resolution information and any assessment of the affected ceiling or wall.

Coordinate plaster repairs and decoration

Decoration should follow the repaired or newly plastered surface's readiness. Build that dependency into the refurbishment programme rather than promising a move-in date from plastering alone. When comparing quotes, check preparation, patch extent, protection and the final condition to be handed over.

PRACTICAL SERVICE DETAILS

Common questions

Can only damaged areas be repaired?

Often, if the surrounding plaster is suitable and the cause has been addressed. Include an expectation for decoration because a repaired patch may remain visually different.

What changes when a property is occupied?

Access, belongings, room use and communication need particular coordination. Confirm arrangements before agreeing a working programme.

What should an agent include in the job brief?

A labelled room list, photos, occupancy status, access contact and known defect history provide a useful starting point. State what work is already complete.

How should decorating be scheduled after plastering?

Allow for the actual material and conditions. Confirm readiness after the plastering rather than applying a fixed interval to every repair.